FAQs

Straight answers to the questions we hear most often from new clients.

A small renovation might take six months. A new build or full gut renovation often runs twelve to eighteen months. We will map out a clear timeline before we start drawing.

Five steps, and the first three cost you nothing but a conversation.

  1. Tell us what is not working in your current space and what you need from it.
  2. We talk through your budget and the timeline you are working to.
  3. Our team reviews the space and proposes a direction for it.
  4. We develop the design and space planning, then quote the works.
  5. You appoint us, and we begin.

Costs move with scope, finishes, and site conditions. As a starting point, for a mid-range specification with a mix of built-in carpentry, flooring, and wet works:

  • 3-room HDB — S$30,000 to S$48,000
  • 4-room HDB — S$42,000 to S$66,000
  • 5-room or executive HDB — S$54,000 to S$84,000
  • Condominium — S$48,000 to S$108,000 and above
  • Landed — from S$180,000

You get a firm quotation after our first site visit, priced against your actual scope.

Absolutely. We are happy to incorporate pieces you already own or source separately, and we will design around them so everything feels considered.

We warrant our workmanship for 12 months after handover. At any point during the works or the warranty period, tell us what you have found and give us reasonable detail on it; we will inspect within a reasonable time and, where the defect is verified, rectify it at our cost.

We are registered with Singapore’s Building and Construction Authority under CR06, the workhead for interior decoration and finishing works. To hold it, a firm has to prove its financial standing, a clean safety record, and technically qualified people running its sites. It also lets us employ our own skilled tradespeople rather than depend on unstable subcontracted labour, and it is the registration most condominium managements ask to see before they will issue a permit to work.

Our BCA registration lets us hire and renew our own S Pass and Work Permit tradespeople, so the carpentry, tiling, and finishing on your project is done by people on our books. Sudden manpower shortages are the most common reason a Singapore renovation stalls halfway; keeping our own crews is how we avoid it. Specialist trades are brought in where the work genuinely calls for them, and they work under our supervision.

Yes, the full permit process is ours to run, whichever kind of property you are in:

  • HDB renovation permits
  • MCST fit-out permits for condominiums
  • Landlord and building submissions for retail, mall, and office units

Each submission carries the risk assessment and method statement the building asks for, along with insurance certificates naming your landlord or MCST where the fit-out manual requires it.

Whatever the building requires, sized to its fit-out manual:

  • Public liability cover, typically S$1,000,000 to S$5,000,000 per occurrence
  • Your landlord or MCST and you named as additional insured on the certificate of insurance, where that is asked for
  • Work injury compensation insurance for every worker on site, for the whole duration of the project

Each job also comes with a risk assessment and method statement: the hazards the work actually creates — hot works, working at height, heavy drilling — and how we control them.

HDB flats, condominiums, and commercial units including malls and offices. Condominium and mixed-use managements usually want proof of BCA CRS registration and a minimum BizSAFE Level 3 certification before they will issue a permit to work, and that submission is something we handle rather than leave you chasing your management office.